LATEST PROJECT SUMMARY


Montes del Plata Mill on the coast of the Río de la Plata which is an estuary of the Paraná and Uruguay rivers.">

Project Summary: On-Site Heat Treatment at the Montes del Plata Mill in Uruguay


Scope: On-Site Heat Treatment (PWHT)
Client: ANDRITZ OY
Industry: Pulp & Paper / Energy
Location: Uruguay

”We are extremely satisfied with the work completed by Heatmasters despite the challenges caused by the pandemic. A great effort was required to get the job done on schedule and Heatmasters heat treatment specialists were flexible and their commitment to work was exemplary. It was easy to work with the “wizards of metal” because they are professionals and know what they are doing. The equipment and tools were also suitable for the works at the Montes del Plata Mill.”
-Jukka Repo, Service Engineer, Recovery Boilers at ANDRITZ OY

Read more

Articles


News

Project Summaries

Heatmasters

Heat Treatment Furnace Manufacturing Process

10.03.2021

Heatmasters

Heat Treatment Services at the Montes del Plata Mill in Uruguay

18.02.2021

Heatmasters

Integration of Modern Temperature Control System to an Existing Heat Treatment Furnace

17.11.2020

Heatmasters

Heat Treatment Works at the Kymijärvi III Bio-Heating Plant Located in the European Green Capital 2021

28.09.2020

Heatmasters

Continuous Improvement Process of Solution Annealing Heat Treatment

30.07.2020

Heatmasters

Heatmasters Service Combo: Pre-Heating and PWHT Of Boiler Drums

23.07.2020

Heatmasters

Maintenance Services at Olkiluoto Nuclear Power Plant

16.06.2020

Heatmasters

Furnace Modernization: From Gas to Electric

23.04.2020

Heatmasters

Project Summary: On-Site Heat Treatment at the Montes del Plata Mill in Uruguay

18.02.2021

Heatmasters

Project Summary: Integration of Modern Temperature Control System to an Existing Heat Treatment Furnace

20.11.2020

Heatmasters

Project Summary: On-Site Heat Treatment at the Olkiluoto Nuclear Power Plant

14.10.2020

Heatmasters

Project Summary: Heat Treatment Services at the Kymijärvi III Bio-Heating Plant

07.10.2020

Heatmasters

Project Summary: Joint-Defined Solution Annealing Heat Treatment Process for High Alloyed Stainless Steel Coil Assemblies

15.09.2020

Heatmasters

Project Summary: On-Site Pre-Heating and PWHT in Fixed Furnaces (Boiler Drums)

15.09.2020

Heatmasters

Project Summary: Furnace Modernization

15.09.2020