Glass Duct Heating During Saint-Gobain Shutdown Maintenance


05.09.2024

Heatmasters

We’re excited to announce that Heatmasters has successfully participated in a shutdown maintenance project together with Saint-Gobain, at their production facilities in Hyvinkää, Finland!

Heatmasters provided heating for a glass duct, while maintenance activities took place at a glass-melting furnace.

During the project, we utilized four Heatmasters’ 500 kW gas burners, controlled with our legendary Rigel26 digital controllers. Heatmasters gas burners were running non-stop throughout the 6-week project. This was important, as the glass duct had to be kept at a constant temperature of 1000 °C for the entire duration, to be able to start up production immediately after maintenance activities were completed.

In glass manufacturing, the “glass duct” or “glass furnace flue” is crucial for transporting molten glass between stages of processing. Maintaining a high temperature in this duct is crucial to prevent the glass from cooling and solidifying before it reaches its intended destination.

A huge thank you to our team for their hard work and to the Hyvinkää factory personnel for their cooperation!

Want to find out more about our services?

Latest Project Summaries


Project Summary: On-Site Heat Treatment at the Montes del Plata Mill in Uruguay

18.02.2021

Project Summary: Integration of Modern Temperature Control System to an Existing Heat Treatment Furnace

20.11.2020

Project Summary: On-Site Heat Treatment at the Olkiluoto Nuclear Power Plant

14.10.2020

Latest News


Development of Technology for the Production of a Lightweight Observation and Defense Container (Look) Made of Nano-structured Ultra-strength Steels

09.09.2024

Glass Duct Heating During Saint-Gobain Shutdown Maintenance

05.09.2024

Celebrating 50 Years of Heatmasters

23.08.2024

Back to News